During the engineering phase, the joint team consisting of SHARQ’s project management and Linde’s project management team worked in Linde’s Dresden office. At the end of the detail engineering phase of the project, both groups moved to Al-Jubail, Saudi Arabia, jobsite to complete the project.
Comprising of a multi-national and multi-cultural workforce, the project management team worked diligently to ensure that all team members are well aligned towards achieving the common goal of completing the projects safely, within budget, and on schedule.
All in all, over 80,000 m³ of concrete had to be poured for the foundations and buildings. The size of the construction site was approximately 500 by 250 metres. The erected steel construction now rises 93 meters above ground. The workforce peaked at more than 5,000 direct and indirect labor onsite.
Despite of the difficulties during the construction phase due to the severe shortage of qualified personnel on the overheated Arabian labour market in 2007 and 2008, Linde’s performance was rated very positively by SHARQ. SHARQ had already taken over the entire plant area in September 2009. The goals of the contractual completion schedules/incentive plans were fully achieved.