For the recovery of NGL/C2+ Linde Engineering offers a well proven expander process enabling recovery rates up to 98 %.
This cryogenic process utilizes an expander to provide the refrigeration duty required for the partial liquefaction of the natural gas. It has been developed in order to minimize or even eliminate the necessity of external refrigeration by maximizing the use of internal refrigeration.
Reference
Customer:
National Petrochemical Company
Plant location:
Assaluye, Iran
Process:
C2+ Recovery Plant
Capacity:
Feed gas capacity 3.000.000 Nm³/h
Start-up:
2004